VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 1This stove meets U.S. Test Standard:UL 1482-2006Vogelzang International Corporation400 West 17th Stree
Page 10 / TR009 PERFORMER™ VGZ-029 / 20110519.0MASONRY CHIMNEYBefore using an existing masonry chimney, clean the chimney, inspect the flue
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 11Figure 17 - Chimney Construction through RoofFigure 18 - Chimney Connection to Firebox through Masonr
Page 12 / TR009 PERFORMER™ VGZ-029 / 20110519.0CHIMNEY CONNECTIONS continued …Consult your insurance company if you cannot find a qualified expert.CAUT
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 13OPERATING INSTRUCTIONSTHIS STOVE IS DESIGNED TO BURN WOOD FUEL ONLY!Hardwood, 18” to 20” should be spl
Page 14 / TR009 PERFORMER™ VGZ-029 / 20110519.0continue to burn, open the air control to re-establish the secondary flames then slowly reset the air c
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 15SERVICE HINTS 7. Empty ashes regularly. Do not allow ashes to pile up (see Safety Instruc
Page 16 / TR009 PERFORMER™ VGZ-029 / 20110519.0WARNING: IN CASE OF CHIMNEY FIRE (1) CLOSE AIR INLET CONTROL (2) GET OUT OF THE HOUSE (3) CA
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 17SERVICE HINTS continued . . .For assistance involving chimney draft issues, con-tact a knowledgeable l
Page 18 / TR009 PERFORMER™ VGZ-029 / 20110519.0ORDERING PARTS - TR009 PERFORMER™ STOVEWhen ordering missing or replacement parts, always give the Mod
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 19PARTS - TR009 PERFORMER™ STOVEWhen ordering missing or replacement parts, always give the Model Number
Page 2 / TR009 PERFORMER™ VGZ-029 / 20110519.0SAFETY INSTRUCTIONSSAFETY NOTICE: IF THIS STOVE IS NOT PROPERLY INSTALLED, A HOUSE/BUILDING F
Page 20 / TR009 PERFORMER™ VGZ-029 / 20110519.0WIRING DIAGRAM - MODEL F-6 BLOWER OPTION
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 21FLOOR PROTECTOR MATERIAL CALCULATIONSThis stove has been tested for and must be installed on a oor pr
Page 22 / TR009 PERFORMER™ VGZ-029 / 20110519.0A. Brick Masonry Minimum 3.5˝/89mm thick brick masonry all framed into combustible wall with a m
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 23
Page 24 / TR009 PERFORMER™ VGZ-029 / 20110519.0Vogelzang International Corporation400 West 17th StreetHolland, Michigan 49423www.vogelzang.comPhone:
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 3or abuse. When installing your stove, use care in handling. Clean with soap and warm wate
Page 4 / TR009 PERFORMER™ VGZ-029 / 20110519.0TABLE OF CONTENTSSAFETY PRECAUTIONS ...
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 5ASSEMBLY INSTRUCTIONSTOOLS AND MATERIALS REQUIRED FOR INSTALLATION t o o l s
Page 6 / TR009 PERFORMER™ VGZ-029 / 20110519.0Figure 7 – Attach Pedestal to Stove Body6. Position the pedestal top and attach with eight (8) machine
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 7LOCATING STOVE1. The stove must be placed on solid concrete, solid masonry, or when installed on a com
Page 8 / TR009 PERFORMER™ VGZ-029 / 20110519.0Figure 13a – Step 1, Bottom Firebrick ArrangementLOCATING STOVE continued…Figure 11a – Front View Minim
VGZ-029 / 20110519.0 TR009 PERFORMER™ / Page 9CONNECTOR PIPE INSTALLATIONConnector pipe is used to make the connection from the final positioni
Comments to this Manuals